Oil from the Deepwater Horizon leak continues to gush into the Gulf Coast Ocean at a rate of around 210,000 gallons per day, leaving engineers and cleanup crews with two massive challenges: stopping the leak, and mopping up the oil that has already made its way into the water.
After BP's forty-foot containment dome malfunctioned, officials at BP began to float other ideas — some of them experimental — including a technique known as a "junk shot": a big wad of trash injected into the top of the well that could, theoretically, plug the leak.
Philip Johnson, a professor of civil engineering at the University of Alabama, joins us with his thoughts on innovative ways to plug the leak. And Erich Gundlach, an independent oil spill consultant who worked on the cleanup of the Exxon Valdez oil spill, among others, offers his take on the creative thinking around cleaning up all that crude oil.
Comments [7]
I had a quickly do-able solution the second day of the leak. Simply insert a deflated heavy-walled rubber bladder about 15 feet into the pipe while it's connected to a pressurized airhose and once in place fill the bladder to capacity. Clamp the airhose and cut it free for later deflation. Then BP can install a new valve at the broken section and later remove the bladder...
Next job clean up the mess. Hey BP, ever hear of a centrifuge?
And when Obama's plan for healthcare epically fails, call me.
I have two ways to fix this problem.talk to me I've all ways been a good troubleshooter.
Maybe try a cement donut around the casing . Prefab a large enough peice to surround existing bop. Need a large flange welded to casing , with multiple cement injection ports. Then reduce to a companion flange for new stack. This would hold because cement would start below the bop and stop flush with bop .
Tampax needs to make a tampon that is 5 feet in diameter to fill in the pipe.
an update to the design i posted earlier http://www.dailykos.com/story/2010/5/11/865491/-Permeable-Cone-Stocking,-a.k.a.-Oil-CorralRevised-UPDATED
Make an enlarged adaptor flange with bearings on the perimeter to pass cable threw. Attach to a second set of BOP's and pull the two sets together using surface cranes, After cutting the pipe. Slot the alignment holes to allow for extra alignment clearance. Then use rov's to make up the attachment bolts.
check out this idea for containing the DWH gusher http://www.dailykos.com/story/2010/5/9/142644/7591
Leave a Comment
Register for your own account so you can vote on comments, save your favorites, and more. Learn more.
Please stay on topic, be civil, and be brief.
Email addresses are never displayed, but they are required to confirm your comments. Names are displayed with all comments. We reserve the right to edit any comments posted on this site. Please read the Comment Guidelines before posting. By leaving a comment, you agree to New York Public Radio's Privacy Policy and Terms Of Use.